Downed Power Line Results In Power Outages

Posted: September 19, 2013 at 10:54 pm

HEA crews are currently working on repairs to a power line between Soldotna and Sterling.

 

The downed line resulted in a power outage that has left approximately 3,800 HEA members in Sterling and parts of the Funny River area without power.

 

HEA crews expect to have the power restored to the area within the next two hours.

Comments are closed.