DOT Construction Update for Seward Highway

Posted: July 10, 2013 at 7:01 pm

The DOT is continuing their summer construction along the Seward Highway.

 

From milepost 67 to 115,be alert to lane restrictions between 7am and 7pm daily, as well as a reduced speed limit at milepost 68 and flagging operations from north of Lyon Creek Bridge to Potter Valley Road.

 

In the Seward Highway Bridge Replacement program, expect 24-hour lane restrictions and gravel surfaces through the end of July.

 

DOT will also be conducting flagging operations from north of Trail River Bridge to Falls Creek, between 7:00am and 7:00pm.

Comments are closed.